The tank in build, dissolving to the camera moving along it under test.
What you are looking at
Two stages of the same machine, cut together: the tank in build on the workshop floor, dissolving to the same tank filled and running under factory test. It is the short version of what happens between an order and a delivery.
The build stage is fabrication and fit-out, shell, cladding, transducer banks, heating, filtration, lift and controls. The test stage is the part that decides whether it ships. The tank is filled, brought up to temperature and run, and the field is checked along its length and depth. Nothing leaves until that is right.
Why we test before despatch, every time
A long immersion tank can look finished and still clean unevenly. The failure is never dramatic: parts come out clean at one end of the basket and marked at the other, and the operator spends months blaming the chemistry. Catching that on our floor costs an afternoon. Catching it on your floor costs a shutdown.
The same test gives us the baseline the machine is handed over on, so when it is serviced in two years there is a figure to compare against rather than an opinion.
Seeing one in person
If a machine of this size is on your list, the most useful thing you can do is send us the part you are worried about. We will run it, photograph it and give you the cycle card. That is a better basis for a decision than any video, including this one.
Every clip here is a documented job
Where an application needs proving, we clean, film, gauge and document it, and the process card stays with the customer.